Below is a list of fixes and enhancements since WBS Chart Pro 4.0. Note that fixes are cumulative. For example, if you are using 4.7 and you upgrade to 4.9a you get the fixes for 4.8, 4.8a, 4.9 and 4.9a.  

 


WBS Chart Pro version 4.9a

Released on November 27, 2012

List of Issues and Fixes since version 4.9

Issue: WBS Chart Pro not compatible with Project 2013.

Fix:  WBS Chart Pro is now compatible with Project 2013.    


WBS Chart Pro version 4.9

Released on February 27, 2012

List of Issues and Fixes since version 4.8a

Issue: Unlinking a WBS chart from a Project 2010 plan would fail.

Fix:  You can now Unlink WBS charts from Project 2010 plans.


Issue: Transferring a project created in WBS Chart Pro to Project 2010 with more than 100 tasks would fail and Project 2010 would display the error message "“Cannot Save – Failed to create table in Microsoft Project”.      

Fix:  You can now send any chart created in WBS Chart Pro to Project 2010. 


Issue: Creating a chart in WBS Chart Pro of filtered data in MS Project, customizing box colors, returning to MS Project, filtering on something else and returning to WBS Chart Pro would lose the custom box settings.      

Fix: You can now filter in MS Project, create a WBS chart, customize boxes, go back to MS Project, filter on something else and it will remember the original box customizations.

   


WBS Chart Pro version 4.8a

Released on May 18, 2010

List of Issues and Fixes since version 4.8

Issue: WBS Chart Pro is not compatible with Project 2010.    

Fix: WBS Chart Pro is now compatible with Project 2010.    


WBS Chart Pro version 4.8

Released on February 1, 2010

List of Issues and Fixes since version 4.7

Issue: In a WBS chart linked to a MS Project plan, dragging a summary task or using cut/copy and paste on a summary task only pastes the summary task and not the subtasks. In other words, it deletes the subtasks when you paste the summary task.   

Fix: This is due to a new behavior of MS Project introduced in Project 2007 SP2 where cutting or copying summary tasks does not include the subtasks. WBS Chart Pro 4.8 overrides this behavior and now always includes the subtasks when cutting or copying summary tasks. We can't think of a reason why you would ever want to cut or copy a Summary Task and not include its subtasks.   


Issue: Help did not work in Windows Vista or Windows 7.     

Fix:  There is a new Help system in WBS Chart Pro that is compatible with all versions of Windows including Vista and Windows 7.


Issue: Hyperlinks to a .docx file did not work.   

Fix: Hyperlinks now work with .docx files and browsing for Word docs in the Hyperlinks tab includes .docx files.


Issue: The Setup file was not digitally signed.    

Fix: The Setup file is now digitally signed and displays as a "Trusted Publisher" when run.


Issue: Uninstalling WBS Chart Pro would attempt to remove components from MS Project even if it did not configure MS Project during Setup. This could cause problems if MS Project was not installed.     

Fix: Uninstalling WBS Chart Pro will not attempt to remove MS Project components if it did not install them. 


Issue: Users of Japanese, Chinese, Korean and Taiwanese Windows would see incorrect dates in WBS Chart Pro when linked to Project. Instead of a date like 12/25/09 Wednesday, WBS Chart Pro would display something like 12/9/25.

Fix: WBS Chart Pro now display correct dates for users of Japanese, Chinese, Korean and Taiwanese versions of Windows.      


Issue: Accessing WBS Chart Pro from the command line and passing it a .txt or .csv file only worked if WBS Chart Pro was closed.

Fix: You can now access WBS Chart Pro from the command line and pass it a .txt or .csv file while the program is running.


Issue: You could not access WBS Chart Pro from the command line and pass it a View.

Fix: You can now access WBS Chart Pro from the command line and pass it View along with a .wbs, .txt or .csv file. Here is an example of the syntax you would use when running this process:

C:\Program Files\WBS Chart Pro\wbschartpro.exe “c:\wbs.txt” view=”view name”


 

WBS Chart Pro version 4.7

Released on January 10, 2008

List of Issues and Fixes since version 4.6

 

Issue: When using MS Project 2003 SP3 and attempting to create a WBS chart from MS Project a blank chart would appear in WBS Chart Pro.   

Fix: This was due to a setting in MS Project that was added to the SP3 release. Installing WBS Chart Pro version 4.7 fixes this or you can manually fix this in MS Project by going to Tools-Options-Security and clicking the "Allow Legacy Files and Formats..." button. 


Issue: Unlinking from a MS Project plan created in Project 2007 Standard would fail.  

Fix: You can now Unlink from a MS Project plan created in Project 2007 Standard.  


Issue: WBS Chart Pro did not support the Czech version of MS Project.   

Fix: WBS Chart Pro now supports the Czech version of MS Project.


Issue: When using WBS Chart Pro with MS Project, could not paste a task after the last task in the project.  

Fix: You can now paste a task after the last task in the project.


WBS Chart Pro version 4.6

Released on February 9, 2007

List of Issues and Fixes since version 4.5

 

Issue: WBS Chart Pro not compatible with Microsoft Project 2007.  

Fix: WBS Chart Pro version 4.6 is compatible with Project 2007 (in addition to Project 4.1a, Project 98, Project 2000, Project 2002 and Project 2003). 


Issue: Could not create WBS charts from MS Project plans stored on SharePoint. If you used MS Project to open a .mpp file stored on SharePoint and then tried to create a WBS chart it would fail. 

Fix: You can now open MS Project plans stored on SharePoint and create WBS charts. 


Issue: Problem with MS Project plans saved to mapped drive letters. If you saved a MS Project plan to a mapped drive letter (eg: Q:) the WBS chart was not able to link successfully to this MS Project plan in some instances. It would create a new WBS chart instead of linking to the existing WBS chart. 

Fix: WBS charts can now recognize mapped drive letters correctly.  


Issue: Passing a .wbs chart on the command line would only work if you did not have WBS Chart Pro running. If you started WBS Chart Pro and passed a filename at the same time it would only work if the WBS Chart Pro program was not currently running. If it was running it would only switch to WBS Chart Pro and not open the file.

Fix: If you run WBS Chart Pro with a filename it will open this file in WBS Chart Pro even if the program is already running. 


Issue: Clicking a .wbs file in a Browser displays text instead of displaying a WBS chart.   

Fix: You can now click a .wbs file in a browser and have it display a WBS chart. However, if this does not work you may need to set the Mime Type or Content Type on your network. See www.criticaltools.com/mime for details.  


Issue: Not compatible with Norwegian or Russian versions of MS Project.  

Fix: Now compatible with Norwegian and Russian versions of MS Project. 


Issue: When linked to MS Project, Cut and Paste in a WBS chart (and Drag and Drop of tasks in a WBS chart) would sometimes drop dependencies. In rare cases it would refuse to perform the Paste altogether and the tasks you were attempting to Cut would disappear. This is mostly due to MS Project's way of handling dependencies when cutting and pasting tasks among different summary tasks. MS Project has an inconsistent approach to whether it maintains or removes links to tasks when cutting and pasting across summary tasks.  

Fix: We now remember all dependencies on tasks that are cut and pasted so that dependencies are maintained. This actually works better then if you cut and pasted tasks in MS Project! 


Issue: Issue with displaying and defining Months and Minutes when using the German version of MS Project.  

Fix: Months and Minutes now displayed and used correctly when linked to the German version of MS Project. 


WBS Chart Pro version 4.5

Released on January 26, 2005

List of Issues and Fixes since version 4.4

Issue: Problems when using Project Server 2002 or Project Server 2003 as described in www.criticaltools.com/projectserver  

Fix: All known problems when using WBS Chart Pro and Project Server 2002 and 2003 have been fixed. 


Issue: In Microsoft Project, if you use the Grouping feature you could not create a WBS chart. Clicking the WBS icon from within MS Project while Grouped displayed a "Bad outline level detected" error message. 

Fix: You can now create a WBS chart from a MS Project plan that is Grouped.  


Issue: No support for the Traditional Chinese version of MS Project. 

Fix: WBS Chart Pro now integrates with the Traditional Chinese version of MS Project.


Issue: When using the Swedish version of MS Project, displaying a WBS chart with the "Hours" field would sometimes display hours as "0d" even though there were hours assigned to the task.  

Fix: WBS Chart Pro now displays hours correctly when using the Swedish version of MS Project. 

Note for other users of Non-English versions of MS Project: If your WBS chart of a MS Project plan displays all other values like Duration, Cost, etc. correctly in the WBS chart but does not display Hours correctly (dislpays "0d") please contact us for a fix. We would need to ask you for a few words of translation and can provide a fix within a day or two.


Issue: Transferring a standalone WBS chart to the French or Spanish version of MS Project would fail.   

Fix: WBS charts are now correctly transferred to French or Spanish versions of MS Project. 

Note for other users of Non-English versions of MS Project: If you experience trouble when transferring a standalone WBS chart to your version of MS Project please contact us for a fix. We would need to ask you for a few words of translation and can provide a fix within a day or two.


Issue: When installing into a Non-English version of Project 2003 it would sometimes stop with MS Project displaying a message to overwrite a View.       

Fix: Fixed the Setup so that MS Project no longer displays a message. 


Issue: When using WBS Chart Pro with certain Non-English versions of MS Project it would crash when Unlinking a WBS chart from a MS Project plan.        

Fix: No longer crashes when Unlinking a WBS chart from Non-English versions of MS Project. 


Issue: With a WBS chart linked to a MS Project plan, changing the Flag names in Tools-Border Names would not be saved.  

Fix: Renaming the Flag fields in a WBS chart that is linked to a MS Project plan now gets saved. 


Issue: Cannot display the CV% field.  

Fix: CV% field now available.  


Issue: Unlinking a WBS chart from a MS Project plan would fail when using Project 2003 Standard. Once Unlinked the WBS chart would disappear. 

Fix: Unlinking a WBS chart from Project 2003 Standard now works. 


Issue: External Task does not appear in the Borders Legend.   

Fix: External now appears in the Borders Legend. 


Issue: A MS Project plan that had Inserted Projects within other Inserted Projects would produce an incorrect WBS chart.    

Fix: You can now correctly create a WBS chart of a MS Project plan with multiple levels of Subprojects or Inserted Projects.  


Issue: No support for double slashes in path names for areas such as "Save as Web Pages" folder or "Tools-Options".     

Fix: Now supports double slashes in path names. 


Issue: In the WBS Chart Pro Edit menu the underlined B (keyboard shortcut) was used for both Paste Subtask and Insert Task Below.      

Fix: Changed the keyboard shortcut for Paste Subtask to an underlined K. 


Issue: With a WBS chart linked to a MS Project plan you could enter greater than 255 characters into certain fields in the WBS chart. These would then disappear when the WBS chart was refreshed.         

Fix: This is because MS Project cannot handle fields with more than 255 characters. We have fixed this so that you can enter up to 255 characters into certain fields in a WBS chart linked to a MS Project plan.  


Issue: The number fields do not display commas.         

Fix: The number fields now display commas or other appropriate number separators as defined in Regional Settings. 


WBS Chart Pro version 4.4

Released on October 14, 2003

List of Issues and Fixes since version 4.3

Issue: WBS Chart Pro versions 4.0 thru 4.3 are not compatible with Microsoft Project 2003.  

Fix: WBS Chart Pro version 4.4 is compatible with Microsoft Project 2003. Download WBS version 4.4 from our website and install over your existing WBS Chart Pro software for compatibility with MS Project 2003.  


Issue: Hyperlinks not supported.    

Fix: WBS Chart Pro now contains a Hyperlink feature that allows you to go to a document or web page. If you doubleclick a task and choose the Hyperlink tab you can enter a Hyperlink Address and Subaddress (a bookmark or section within a document or web page). Any task with a Hyperlink will display a small box above and to the left of the task box. Click this box to jump to the specified Hyperlink.  


Issue: Creating a WBS chart from Microsoft Project while in the Task Usage or Resource Usage View could crash WBS Chart Pro and/or MS Project. 

Fix: You can now go to WBS Chart Pro from MS Project's Task Usage or Resource Usage view. 


Issue: Selecting Save As Default for customized Flag and Border Names that were not being saved. 

Fix: Now saved.


Issue: Custom colors and box positions in a Standalone WB chart that was transferred to MS Project would lose the custom colors and box positions.   

Fix: Custom colors and box positions in a WBS chart transferred to MS Project are not maintained. 


Issue: Box Widths and Box Heights were taking into account tasks that do not appear in the chart. Because of this, if you selected to Match Box Widths or Match Box Heights it would appear to make boxes much bigger than any in your chart.   

Fix: Box Widths and Box Heights now only take into account the tasks on the screen. 


Issue: Tasks with Custom Box settings that were hidden in MS Project would appear in a chart.   

Fix: Now they stay hidden. 


Issue: WBS charts linked to later versions of MS Project could not be opened using an earlier version of MS Project. For example, if you had a WBS chart linked to a Project 2002 plan and then tried to open it with Project 2000 installed it would fail.   

Fix: WBS charts linked to MS Project plans are now backwards compatible. 


WBS Chart Pro version 4.3

Released on January 13, 2003

List of Issues and Fixes since 4.2

Issue: When working with WBS Chart Pro and large MS Project plans it can be slow to create WBS charts. Even when filtering a small number of tasks it still takes a long time to produce a WBS chart. 

Fix: This version uses a new technique to extract data from MS Project which should make it much faster. Especially if you are using large MS Project plans and use filters to display only a small number of tasks. It no longer needs to grab all of the tasks from the MS Project plan but only the filtered tasks. You should now see significant speed improvements when displaying a small number of tasks from a large MS Project file. 


Issue: When creating a WBS chart of a large MS Project plan, small changes would force WBS Chart Pro to stop and refresh all of the data from the MS Project plan. On large files this was very time consuming. 

Fix: This is now optimized to only extract the relevant data from MS Project enabling it to be much faster. 


Issue: Creating WBS charts from MS Project would leave various *.TMP and/or *.TXT files in the MS Project most recently used file list (the files you see at the bottom of the File menu in MS Project). 

Fix: This process is now kept to a minimum and only one .txt file (CriticalTools.txt) is used. You should only see this file occasionally in the Most Recently Used File list in MS Project. 


Issue: Using the @Risk software from Palisade Software with MS Project 98 or Project 2000, @Risk would stop working when WBS Chart Pro is installed into Project 98 or Project 2000. 

Fix: The problem was that WBS Chart Pro installed a Table into Project with greater than 91 fields. If a table exists in Project 98 or Project 2000 with greater than 91 fields defined this would cause @Risk to fail. WBS Chart Pro no longer uses tables in MS Project and installing this new version of WBS Chart Pro removes the old tables. You can now install and run both @Risk and WBS Chart Pro in MS Project.  


Issue:  WBS Chart Pro could not link to MS Project Database files (*.MPD). You could create charts from a database file within MS Project but the corresponding WBS chart was not linked and any changes made to the WBS chart would not update the corresponding Database file in MS Project.  

Fix: WBS Chart Pro can now create linked charts of Database files that have been opened in MS Project. WBS charts are Linked and any changes you make to a WBS chart are immediately reflected in the corresponding MS Project plan.   


Issue: WBS Chart Pro could not link to MS Project plans stored in Project Server (*.published, etc). You could create charts from a published Project Server plan but the corresponding WBS chart was not linked. Any changes made to the WBS chart would not update the corresponding Project Server plan in MS Project.  

Fix: WBS Chart Pro can now create linked charts of published Project Server plans in Project 2002. WBS charts are Linked and any changes you make to a PERT chart are immediately reflected in the corresponding MS Project plan. 


Issue: When saving charts on certain networks an "Access Denied" message was displayed and you were unable to save to the network drive.  

Fix: You should now be able to save on any network drive.   


Issue: WBS charts (*.wbs) linked to a MS Project plan would remember the version of MS Project that it was linked to. If you attempted to open this WBS chart using a different version of Project it could potentially fail. 

Fix: When opening a WBS chart file (*.pce) it will attempt to open the version of Project it was saved with but if this is not present then it will open the latest version of MS Project installed.    


Issue: Date fields displayed in the Header and Footer of charts were only being updated when the chart was created. 

Fix: Date fields displayed in the Header and Footer of charts are now constantly updated to always display the correct date and time.    


Issue: Sometimes the screen would jump around when you added or deleted a task in the WBS chart.   

Fix: The screen should no longer jump around when adding or deleting tasks.   


WBS Chart Pro version 4.2

Released on May 13, 2002

List of Issues and Fixes since version 4.1

Issue: WBS Chart Pro not compatible with Project 2002.  

Fix: WBS Chart Pro 4.2 is compatible with Microsoft Project 2002.  


Issue: Changing a View in a chart would not update the default unless you did an Export (which was not the obvious thing to do). 

Fix: If you change a View in a chart this View is automatically saved over the default View of the same name in the Views folder. This means that when you open another WBS chart it will have the same formatting options. 

There is also an option to Automatically Save Changed Views, Prompt to Save Views or Do not Save Views. These are set in Tools-Options.  


Issue: If you saved a WBS chart linked to a MS Project plan you had to save it into the Documents directory for MS Project to find it the next time you went from MS Project to WBS Chart Pro.  

Fix: If you save a WBS chart from a MS Project plan the next time you go from your MS Project plan to WBS Chart Pro it will automatically open this saved WBS chart wherever you may have saved it.  


Issue: If you created a WBS chart from Microsoft Project and saved this WBS chart this did not automatically save the corresponding Microsoft Project plan.   

Fix: If you create a WBS chart from a Microsoft Project plan and save the WBS chart it also saves the corresponding MS Project plan.


Issue: Sometimes the screen would jump around when using a feature or menu.  

Fix: Sometimes the screen would jump to the "current" task (the one with the red outline) when it was not necessary. This would cause the screen to move away from the area of the chart that you may have been viewing. We have fixed this so that the screen only moves when necessary.  


WBS Chart Pro version 4.1

Released on October 1, 2001

List of Issues and Fixes since version 4.03

Task Scheduling

WBS Chart Pro 4.1 automatically performs task scheduling when used by itself. This means that as you type in Start Dates, Finish Dates, Durations, etc. WBS Chart Pro automatically calculates the schedule. WBS Chart Pro contains a calendar that also allows you to specify working and nonworking days and hours.

If WBS Chart Pro is linked to a Microsoft Project plan then the scheduling is performed by MS Project. Task scheduling only applies when using WBS Chart Pro by itself.


A Seamless Integration with the new PERT Chart EXPERT software (version 2.0)

WBS Chart Pro 4.1 contains a new toolbar button that allows you to transfer WBS charts directly to our other software application, PERT Chart EXPERT. You can also transfer PERT charts from PERT Chart EXPERT into WBS Chart Pro 4.1. 

Transferring of charts between WBS Chart Pro and PERT Chart EXPERT requires WBS Chart Pro 4.1 or later *and* PERT Chart EXPERT 2.0 or later. 


WBS Chart Pro version 4.03

Released on April 16, 2001

List of Issues and Fixes since version 4.01 (there was no version 4.02)

Issue: WBS Chart Pro was not compatible with the Swedish and Japanese versions of Microsoft Project 98 and 2000. 

Fix: We added compatibility for the Swedish and Japanese versions of Project 98 and Project 2000. WBS Chart Pro should now work properly with the Dutch, French, German, Hebrew, Italian, Japanese, Portuguese, and Spanish and Swedish versions of Microsoft Project 98 and Project 2000. If you are using a Non-English version of MS Project other then the ones mentioned above, please contact us and if you are willing to run some tests, we can have a version for you within a day or so. These tests only take 10 or 15 minutes.  


Issue: In some instances when saving a chart, WBS Chart Pro would take an extremely long time to save and would appear to hang the system. 

Fix: When saving WBS charts on certain networks or with certain network protocols the buffering of data was not being performed correctly and thus slowed down the save process significantly. We have fixed these issues and saving WBS charts on all networks works properly now and is no longer slow. 


Issue: If you rebooted, selected End Task in the Task Manager or otherwise interrupted the Save process in WBS Chart Pro you could potentially lose data. 

Fix: This has been fixed and you no longer lose data if save is interrupted. 


Issue: If you opened an MPX or TXT file in WBS Chart Pro, added or deleted tasks, saved and then closed the WBS chart you would sometimes lose these edits when you re-opened the WBS chart. The tasks you added would not be there or the tasks you deleted would come back when you reopened. 

Fix: This only happened if you opened and MPX or TXT file and then immediately pressed the save button or selected File-Save from the menu. It would then ignore and tasks added or deleted and simply open the original MPX or TXT file when you re-opened the WBS chart even though the WBS chart appeared to be "Unlinked". This is now fixed. 


Issue: Cannot automatically increase the size of a WBS chart when printed. 

Fix: When printing, you can now select an " Enlarge to Fill Page" option. This option automatically increases the size of  the chart to fill the specified number of pages. This option is found in the File-Page Setup menu. 

Note: This is a great new feature!


Issue: The Project 2000 fields "WBS Predecessor" and "WBS Successor" were not listed in WBS Chart Pro. 

Fix: The Project 2000 fields "WBS Predecessor" and "WBS Successor" have been added to the fields available in WBS Chart Pro.


Issue: Page Layout fields like Manager, Title, Subject were not being updated properly when displayed on a chart when using WBS Chart Pro in standalone mode (when not linked to MS Project). 

Fix: These fields now get updated in a standalone WBS chart. 


Issue: Could not display negative durations in fields such as Total Slack, Duration1, etc. 

Fix: You can now display negative durations. 


Issue: Certain ISO-8601 Date formats were not available. 

Fix: Date formatting has been enhanced to include ISO-8601 week number formats. 


Issue: Could not display the filename on a printout. 

Fix: Two new fields have been added to the Page Layout list - "Filename" and "Datasource Filename". These allow you to print the WBS chart filename or the Datasource filename on the printout. There are also options for these fields to print the filename without an extension or with a file extension. 


WBS Chart Pro version 4.01

Released on December 12, 2000

List of Issues and Fixes since 4.0

Issue: When creating a WBS chart from Microsoft Project it would occasionally display the message "Server Busy - Hit Retry to continue".

Fix: This was a timeout issue when communicating with MS Project. The timeout was increased and the message no longer appears.


Issue: When creating a WBS chart from MS Project it expands all of the tasks in Microsoft Project.

Fix: We have fixed several issues in this area. They are:

When you deactivated WBS Chart Pro (for example, to check your email, use WBS Chart Pro Help or used the Task Bar to return to MS Project) upon returning to WBS Chart Pro it would perform a complete refresh and display all tasks in the chart. WBS Chart Pro now remembers the tasks that were initially displayed and preserves this list. It still must perform a refresh of the data (in case you changed something in MS Project) but now it will not change the current set of displayed tasks. 

When creating a WBS chart from Project it would automatically Expand All tasks in Project as soon as the WBS chart was created. In some cases this is necessary but not always. WBS Chart Pro is now smarter about Expanding All tasks in MS Project and will only do this when necessary. It is necessary to Expand All tasks in MS Project when you have Subprojects in the current MS Project plan or perform a Cut/Copy/Move Paste in a WBS chart that is linked to a MS Project plan.


Issue: File locking was not working. In other words, multiple users could access the same WBS file on a network without locking any out. 

Fix: File locking has been fixed. The first person to open a WBS file on a network or shared drive will have access to this file to Read and Write (save) changes. Each subsequent user who attempts to open a file in use will only have access to the file in Read Only mode.  


Issue: When printing a WBS chart, it would occasionally omit a character or word at the end of a line of text even when Print Preview displayed it correctly. 

Fix: This only happened when the "Fit to Page" feature was used and has now been fixed.  


Issue: Creating a WBS chart while using the Grouped Gantt Chart feature of Project 2000 would fail.

Fix: You can now create a WBS chart while tasks are Grouped in a Gantt Chart in Project 2000. However, this does not mean that WBS chart recognizes the hierarchy of the Grouped Gantt chart, it still only displays the hierarchy from indenting and outdenting Summary Tasks.


Issue: Creating a WBS chart from MS Project when no Summary Tasks were displayed would produce a blank chart.

Fix: Creating a WBS chart from a MS Project plan where summary tasks are hidden (through filtering/grouping) now works OK - if a summary has any visible subtasks, then the summary is made visible.


Issue: The Hourglass would not appear during some long operations . The cursor was still displayed making it appear that the program was ready when in fact it was performing calculations. 

Fix: The Hourglass now appears to indicate that the program is busy. 


Issue: You could use Alt-Tab or select the Task Bar during some long operations and interrupt the communication between WBS Chart Pro and MS Project. This could cause some unpredictable behavior.

Fix: Alt-Tab and selecting the Task Bar during some long operations is disabled until the operation is complete.


Issue: If you saved a .WBS file with no data it would crash when attempting to open this empty file.

Fix: It no longer crashes when opening an empty WBS chart. 


Issue: Using WBS Chart Pro with Non-English versions of Microsoft Project would sometimes fail. 

Fix: We have fixed several issues related to using WBS Chart Pro with Non-English versions of MS Project. These include: crashing when performing a Cut/Copy/Paste when linked to a MS Project plan, displaying a message that MS Project needed to be configured when it was already configured and not displaying data correctly when using WBS Chart Pro with a Non-English version of MS Project.

WBS Chart Pro should now work properly with the Dutch, French, German, Hebrew, Italian, Portuguese, and Spanish versions of Microsoft Project 98 and Project 2000. If you are using a Non-English version of MS Project other then the ones mentioned above, please contact us and if you are willing to run some tests, we can have a version for you within a day or so. These tests only take 10 or 15 minutes.